Electrical
Installation/Instrumentation:
|
|
|
|
|
Owner
/ Client / Consultants |
Projects
|
|
RAK White Cement Co.
Ras Al Khaimah, UAE. /
FLS Miljo USA / Halcrow International, Dubai.
|
|
|
Dubai Aluminium Co,
Dubai, UAE.
|
-
Cast
house no.1 Tunnel services - Design, supply,
installation & commissioning of Electrical &
Instrumentation system on turn key basis for
Drain pumps, fire alarm system & Tunnel
lighting.
|
|
Pastallini Food
processing Industries, Dubai.
|
-
Samolina storage
and conveying System -
Design,supply,installation & commissioning of
Electrical & Instrumentation system on turn key
basis for unloading ,storage and transportation
of Samolina.
|
|
Amandus Kahl Gmbh /
Germany / Emirates link maltauro,Abu Dhabi
|
-
Fodder Plant
Indudtrial project., Mussafah, Abu Dhabi -
Installation, testing & Commissioning assistance
for complete Electrical & Instrumentation system
consisting of MCCs, Control Panels, Cabling etc.
|
|
RAK Cement Co., Ras Al
Khaimah / Technip , France
|
-
Lime
stone pregrinder - Vertical Mill -
Supply,installation , testing & commissioning
assistance for complete Electrical &
Instrumentation works of Mill including supply
of Cables,cable trays conduits etc.
|
|
Al Ain Cement Factory
Al Ain, U.A.E.
ABB, Switzerland
|
-
Plant
Modernization Phase – 1
Turnkey erection contract for installation and testing
of complete electricals for Pollution Control /
dedusting for Kiln Line No.1, Kiln Line No.2, Dust
Collector for Raw Mill No.2, Preheater Bypass, Dust
Handling to Marl Quarry and Cement Mill NO.1 & 2
in closed circuit.
-
Natural
Gas Firing System
Complete electrical installation work for Conversion
of Natural Gas Firing and other modification works
of Cement Plant
|
|
RAK
White Cement Co., U.A.E.
Hitachi Zosen Corporation, Japan Consultants : Blue
Circle, U.K.
|
-
Expansion
Project, Line No.3
Total Electrical Works of Line 3, comprising
of 6.6 KV station, load centers, DCS System, Instrumentation,
Earthing System, Fire alarm System, Paging System,
Power and Control Cabling and Plant Lighting.
|
|
Union Cement Co., Ras Al Khaimah, U.A.E.
LURGI, Germany
|
-
Electrostatic Precipitators - 2 Nos.
Installation of HV and LV Cubicles, Cable Trays,
Conduits, local switches, junction boxes, cable
laying & termination and lighting.
|
|
General Industry Corporation - Abu Dhabi, Flour & Animal
Feed Mill, Abu Dhabi, U.A.E.Buhler Ltd., Switzerland
|
-
Pneumatic
Shipunloaders - 2 Nos.
Installation and testing of Transformer, MV Switchgears,
MCC, PLC Control System, Cabling and Illumination
works·
-
Feed Mill Extension
Complete Electrical and
Instrumentation works
|
|
Gulf Cement Company, Ras Al Khaimah, U.A.E. Cemag GmbH,
Germany, Fuller, U.S.A.
|
-
Dome
Silo Clinker Storage·
-
Clinker Pre-crusher, Petcoke Indirect firing
system & Silica Crushing System
Installation, testing and commissioning of Electricals
comprising of HV/LV Switchgears, Transformer, HT/LT
Switchgears, Control Panels, MV/LV cabling, MCC
Control Panels, Cabling, Lighting, Earthing, etc.
-
Kiln/Raw Mill Vent System and Cooler Vent System
Installation, testing and commissioning of MV/LV
Panels, Control Panels, Drives, Instruments, Earthing
and Lightning Protection system, Paging System,
MV / LV and Control Cabling
|
|
International Foodstuff Co.,Sharjah, U.A.E.Buhler Ltd.,
Switzerland
|
-
Shipunloader
at Hamariayh Port, Sharjah
Installation and testing of MV Switchgears, Transformer,
MCC, PLC Control System, Cabling and Illumination
works
|
|
Gulf Import & Export Co., Dubai, U.A.E.Buhler Miag,
Germany
Buhler AG, Switzerland
|
-
Pulses
Storage and Processing Plant
-
Animal
Feed Mill
Electrical Works comprising of LV Distribution system,
cabling to process equipments, Fire detection system,
earthing and lightning protection system and lighting
|
|
National Cement Co., Dubai, U.A.E.
|
-
Cement
Mill No.2 - Modification·
-
Preheater
Modification and Upgradation work
Complete electrical installation work
|
|
|
|