| Plant |
Project
Description
|
| Kuwait
National Oil Company, Kuwait |
Specialized
services for F.C.C. Regenerator Cone Repairs by
weld overlay at Mina Al Ahmadi Refinery, including
support design and piping relocation
|
| National
Cement Co., Dubai, U.A.E. |
- Upgradation
of Cement Mill no. 1 & 2 (from open circuit to closed
circuit).
-
Replacement of internal parts of existing LURGI
ESP for both Raw Mill no. 1 & 2
-
Manufacturing & Erection of Diffuser in the Main
Conditioning Tower
-
Replacement of complete preheater cyclone, duct,
chutes, inlet chamber, kiln outlet and complete
refractory work.
|
|
Fertilizer Plant
|
Retubing
of 240 Nos. HK-40 Catalyst tubes in PRIMARY REFORMER
of Haldor Topsoe design. The job involved removal
of the existing Catalyst Tubes, outlet pigtails,
modification of the inlet pigtails, erection of
new Catalyst tubes and new outlet pigtails, welding
of 480 Nos. SS-321 and Incoloy 800 joints.
|
|
Dugas Plant, Dubai, U.A.E. |
Replacement
of Column Trays
|
|
Ras Al Khaimah Cement Plant, Ras Al Khaimah, U.A.E.
|
-
Modification of Girth Gear Seals, Top casing of
Bag Filter, belt conveyors
-
Dismantling and erection of Linkers of 1st Chamber
& and Intermediate Diaphragm
-
Dismantling & mounting of Gear on Shaft for cement
mill.
- Modification
of Cement and Raw Mill Outlet Chute and diaphragm
gratings including supply & fabrication
-
Dismantling & Installation of castable refractory
in cyclones (5 nos.) in Preheater
|
| Fertilizer
Plant |
Replacement
of SECONDARY REFORMER including fabrication
and part replacement of Transfer Lines. Also application
of all refractories and bubble alumina castables.
|
|
Union Cement Company, Ras Al Khaimah
|
-
Supply, fabrication and replacement of various Kiln
Shells for Kiln no. 1, 2 & 3
-
Dismantling, supply, fabrication and erection of
filler bars, stoppers, cleats, etc., for Tyres 1,
2 & 3 for Kiln No.1 & 2 - M/S. I. H. I. JAPAN
-
Supply, Fabrication & Installation of Waste Gas
Ducts for Kiln No.3, Dismantling of Kiln Shell,
Erection and welding, etc.
|
Refinery Plant.
|
-
Providing additional Heater tubes in convection
& radiant zones of F-1 HEATER & replacing Transfer
Line in AU-II -
-
Replacement of Heater tubes in VIS BREAKER Unit
in AU-IV.
- Repairs
and maintenance of HEATERS 1F01, 31F01 and replacement
of convection coil in HEATER NO. 33F02
|
|
Al Ain Cement Plant Al Ain, U.A.E. |
-
Replacement of various Kiln sections for Kiln no.
1 & 2, including planetary cool tube, kiln shell
under tyre, kiln rollers, kiln outlet piece, kiln
drive·
- Supply,
fabrication and erection of complete GBF cyclone
including dismantling of existing GBF cyclone along
with supply and installation of new TSC hard stone
material Liner and Cast Besalt Tiles with Mortar·
- Replacement
of liner plates for Cement Mill no. 1 & 2, Raw Mill
no 1 & 2 and Upgradation of Cement Mill no. 1 &
2 and Raw Mill no. 1 & 2 as per IHI design.
-
Replacement and modification of chain conveyor &
drive, bucket elevator and buckets, impeller, bypass
duct, air blaster, etc.
|
|
Fertilizer & Agro-chemical Plant
|
Replacement of 240 Nos. HK-40 Catalyst tubes in
PRIMARY REFORMER. The job involved removal
of the existing Catalyst tubes, outlet pigtails
and erection of new Catalyst tubes and new outlet
pigtails, welding of 480 Nos. Incoloy 800 joints.
Note: This job was completed in a record time of
8 1/2 days.
|
|
Gulf Cement Company Ras Al Khaimah, U.A.E.
Cementas VGmbH, Germany
|
Replacement
of various cement plant equipments -
-
5 nos. kiln shell including tyres, rollers,
chair pads and kiln drives
-
Complete preheater cyclone, ducts, chutes,
raw mill pipes, refractory castable, etc.
-
Upgradation of existing grate cooler and modification
of various parts
-
Replacement of raw mill Trunion, Stabilizer
and ESP ducts
|
|
| Al
Ain Compost Plant U.A.E. |
Replacement
of upper part of the mill including fabrication,
hard facing & balancing of Rotor, and modification
hydraulic system for Mill no. 1 & 2
|
|
Fujairah Cement Industries Fujairah, U.A.E.
|
Replacement
and various modification works related to the various
cement plant equipments:
-
Replacement of 7 nos. kiln shells including
kiln tyres, rollers, base frames, chair pads,
girth gear, grate cooler parts
-
Replacement of cooler section, Aumund chain
conveyors, kiln outlet shell, cement mill,
girth gear and pinion
-
Preheater cyclone at 5th stage including Hot
Gas Duct
-
Replacement of complete refractory work for
the Kiln, Preheater and Grate cooler
-
Upgradation of Cement Mill from open circuit
to closed circuit.
|
|
|
|
|