Client
|
Description of Work
|
|
State Corporation of Petroleum, Govt. of Iraq |
LPG
Project at Iraq Storage Terminal, Iraq Receiving
Terminal and Intermediate Pumping Station at different
places in Iraq
complete Pipingwork– 600 MT
|
|
Furnace Engineering Inc., Japan |
Fabrication of heater coils for H-120 Tube bundle,
Abu Dhabi Oil Co., Mubbaras Island, U.A.E.
|
|
Kemira Engineering OyFinland |
Fertilizer
Project – Jebel Ali, U.A.E
Supply, fabrication and installation of Stainless
Steel (316L) Process and Utility Pipeline including
Mild Steel Pipeline.
|
|
Al Ghurair Investment L.L.C., Jebel Ali, U.A.E. |
Edible Oil Refinery Project
Supply, fabrication and installation of SS (316L)
Process and Utility Pipeline including M.S. Pipeline.
|
|
Ishikajima-Harima Heavy Industries Co. Ltd., Japan |
Installation of pipeline for Modernisation Project
of Al Ain Cement Factory, Al Ain, U.A.E.
|
|
Gulf Extrusions Co. (L.L.C.), Jebel Ali, U.A.E. |
-
Installation of Pipeline for Powder Coating Plant
-
Supply,
fabrication and installation of Stainless Steel
Pipeline for Cyclone Five Chamber Pretreatment Tunnel
Type Washing machine
|
|
Hitachi Zosen Corporation Japan |
Installation of Pipeline for new Kiln Line - RAK White
Cement Expansion Project, U.A.E.
|
|
Arabian Packaging, Rashidiya Dubai, U.A.E |
Piping work for Flexible Packaging Plant at Rashidiya,
U.A.E.
|
|
Anglo Gulf Agrochemicals Ltd., Jebel Ali, U.A.E. Consultant:I
C I ,U.K. |
Installation of Pipeline for Pesticide Plant
|
|
Al Ain Cement Factory, Al Ain,U.A.E. |
Installation of Gas Pipeline for Natural Gas Firing
equipment.
|
|
Masafi Mineral Water Co.Dubai, U.A.E. |
Supply and Erection Stainless Steel Pipelines for
35,000 bottles per hour Mineral Water Factory.
|
|
Toshiba Coporation Japan / Lahmeyer International |
Prefabrication of Pipe spools-625.551 M.T for Dubai Electricity and
Water Authorities (DEWA) Jebel Ali L Station - Phase - 1
|
|
Toshiba Coporation Japan / Arabian Power Company |
Prefabrication of Pipe spools-572.00 M.T- Umm Al Nar WPP - (ADWEA)
|
|
JGC Coporation / Furnace Engineering, Japan |
-
Fabrication of Radiant, Convection & Cross over piping from 8" dia carbon steel plain / finned tubes for Hot Water Heaters BAB field expansion project at ADCO, Abu Dhabi, U.A.E
-
Supply &
fabrication of Fuel Gas Piping around heaters for burners - approx. 850 Inch dia- ADCO, Abu dhabi, U.A.E.
|
|
Dubai Aluminium Co.Ltd Dubai, U.A.E. / K Home Engineering |
-
Fabrication and Installation of Waste Gas Mains Ducting - Carbon steel 5 mm / 10 mm
-
Supply &
Replacement of Worn Out ducts in green mill area Carbon Steel - Sch. 40 12",10"
|
|
Ohanat Gas Development,Algeria / EPC Contractor : Petrofac International |
Fabrication of Piping Spools for Skids - Carbon Steel SCh. 80 Duplex Steel SCh. 40S
|
|
ADCO, Abu Dhabi |
Fabrication of Incoloy (Sch. 10 & 40)and C S Heavy Wall (Sch. 80/160) Piping spools for ASAB Thamama Zone A & B Gas Injection Pilot Project - Petrofac
|
|
Foster wheeler Fired Heaters Ltd. Canada |
Coil (Incoloy - 800 H) Fabrication and tube bending, including anneal after bending,installation of intermediate tube supports, baffle plates and manifold supports,hydrotest and required NDE and grain size testing. - Process Air Heater Replacement - Qatar Fertilizer Co., Mesaieed, Qatar
|
|
National Flour Mill, Dubai, U.A.E / Consultants : Krupp Elastomertechnik Germany |
Fabrication & Installation of Piping work for Edible Oil Refinery at Jebel Ali, U.A.E. SS321,CS,CU Tubing
|
|
Emirates Refining Co. Sharjah, U.A.E / Consultant : De-Smet, Belgium |
Fabrication,erection & testing of CS and SS Piping work for ERCO-V Project - CS Sch.40,SS Sch. 10S to 40S,Cu Tubing, etc.
|